CX · Logistics · Warehousing · Fleet Management Your Solution Is One Click Away →
Skip to main content
Solutions
Market ExpansionFleet & Field OperationsDistributed WarehousingEvents & Activations
Industries
AV & RoboticsHardwareDistributed ProductsEvents & ActivationsEnergy & InfrastructureMedical Devices
LoginBook a Strategy Call
Skip to main content

    We’ll respond within 1 business day. Covered by NDA on request.

    icon
    WHY BRICK

    Trade Show Freight Programs Built Around How You Actually Work

    icon

    Organized Freight Planning Up Front

    A trade show program runs better when the freight plan is set before pickup. We work through inbound legs, target windows, and contingencies in advance.

    icon

    One Point of Contact for the Whole Calendar

    Booth teams benefit from a single contact who knows the whole freight program. We staff that role for the entire calendar instead of rotating people.

    icon

    Better Planning for Repeat Exhibitors

    Programs that show up at the same events year after year do better with a partner that builds institutional knowledge. We carry notes and lessons forward.

    icon

    Simpler Return Logistics

    The booth has to go somewhere after the show. We handle the pickup, condition check, and outbound routing so post-show wrap-up does not stretch into the next week.

    icon
    HOW IT WORKS
    dot-icon

    Plan & Receive

    We receive your booth, displays, and materials at our local warehouse. Everything is logged, photographed, and stored securely until ship date.
    dot-icon

    Prep & Deliver

    We pull inventory, kit promotional materials, and coordinate delivery to the convention center on your timeline, to your booth number.
    dot-icon

    Strike & Return

    After the show, we handle booth pickup, condition reporting, cleaning if needed, and either return to local storage or ship to your next event.

    Frequently Asked Questions

    What does Brick Dynamics handle for trade show programs?

    We coordinate the freight side of your trade show program — inbound receiving, storage between shows, kitting and prep, on-site delivery, drayage coordination, and post-show return shipping. The same crew runs every move, so your team is not switching vendors mid-tour.

    How early should we ship booth freight to your warehouse?

    For most shows, we recommend booth freight arrives at our local warehouse seven to ten business days before move-in. That gives time for receiving, condition checks, graphics replacement if needed, and prep before the venue target window.

    Do you handle installation and dismantle?

    Yes. We can coordinate freight only, or run the installation and dismantle labor alongside it. Most exhibitors use both services on one contract so the booth crew is the same end to end.

    What happens if booth freight gets damaged?

    Damage is photographed at receipt against the inbound manifest and logged to our platform before the booth moves to the show floor. You see the documentation with timestamps. If the damage means the booth cannot go up as planned, we coordinate emergency replacement or a contingency layout with the show contractor.

    Can you handle multi-state trade show programs?

    Yes. The same account, inventory record, and platform follow the booth from one show to the next. When the program moves between states, the handoff happens internally without you re-onboarding a new vendor.

    Working an event in Wisconsin? Talk to Brick Dynamics.

    Brick Dynamics operates in Wisconsin as one of 65+ active US metros. Tell us about your Wisconsin event and we’ll connect you with the local team.

    See all 65+ Brick Dynamics metros →